Deck for Alvedande – Memo
Building a deck with about 600 meters long and 1.30 wide, on the left bank of the backwaters, starting from the existing bridge.
This public equipment will be built in a recycled material type WPC, waterproof and resistant.
Throughout this deck and each 50 meters, benches for about 3/4 people facing the river will be placed.
(See image 3)
On the right bank of these backwaters, and next to the fish market, is to be built a pier berthing that brings fish
unloading closer to fish market.
(See image 1 and 2)
Alternatively (image 3 and 4) a pier on the left bank as schematically indicated